Search
Bad Fitting, Now fixed by MK Drains, Balbriggan.
- Kevin Walsh
- Jun 20, 2017
- 1 min read
This is a job we carried out yesterday. Existing 4" pipe was incorrectly installed into the side of the man hole. This was causing on going blockages. We excavated the outlet pipe. We then installed a new pipe into the middle of the man hole re benched man hole and left the work area as it was before we carried out repair works.





Comentarios